top of page

BUILDING TECHNOLOGY I​

​

In this module students will be exposed to a more extensive study of building construction by exploring the latest and more advanced technology and practice of the industry. The topics covered in this module are industrialized building system (IBS), modular coordination, high-rise building, façade system, steel construction, building information modeling (BIM) and UBBL. In addition, it is also intended to expose students to the study of construction through case studies of existing buildings and applying the construction methods and systems of the building into their own design

PROJECT 1 : INDUSTRIALIZED BUILDING SYSTEM

​

Task:

​

This is a group assignment which predominantly relates to the topics of Industrialised Building System (IBS). Before embarking on this project students will be exposed to different types and methods of the IBS system and the calculation of IBS scoring in the classroom. First, the group are require to design a 3-storey apartment block using mainly IBS components. The group has to construct a physical sectional model of the building to show the IBS components in detail.

PROJECT 2 : CONSTRUCTION SOLUTIONS

​

Task:

​

This assignment is aligned with the Studio Design Project (semester 4 and 5) and aims to facilitate students in the technical studies and development of their design. It deals with the analysis and establishment of the structural and the envelope systems of the student’s design to ensure that the design has logical and workable construction systems. It also encourages students to think about construction as integral part of the design and not just an afterthought. Most of the times amateur designers tend to design their spaces without thinking about the construction aspects and later on have to change and redesign their schemes due to the designs were unbuildable. This assignment was designed with the intention to tackle this issue and to increase the technical competency of students.

bottom of page