PROJECT 1 : SKELETAL CONSTRUCTION (TEMPORARY BUS SHELTER)

​

Task One: In a group of 5, we were to construct a temporary bus shelter that accommodate 5-6 people in a scale of 1:5. The bus shelter should consist of all building components such as roof, columns, walls, and floor to demonstrate the knowledge of skeletal frames and its joints. 

​

Moreover, an A3 report should be attached that documents the analysis of the design, construction progress and test results. We chose to work with a steel skeletal frame bus shelter that takes the form of the two following shapes (as mentioned in the brief), a cube and a cuboid.

PROJECT 2 : UNDERSTANDING FORCES IN BUILDING CONSTRUCTION

​

Task One: In this project, we were to form a group of 3 and to propose a building (tensile/membrane construction or grid shell construction) and identify the structural systems used in the construction of the building. We were then to produce a construction model showing the structural systems used in the above building. 

​

We were to also include 2 A2 boards showing exploded axonometric construction details and information regarding the building. The building we chose was a tensile structure, Ab-O-Atash Amphitheatre.